Monday, April 25, 2022
Today's Progress
The beardy boys were back in action forming up for pouring concrete under the walls of the barn. Christopher worked with Carl Cole and his helper Terry to get the fence post holes augured and the posts in place and braced. The beards were not quite done forming up and decided to get a small load of concrete for around the posts. in their usual superman fashion they filled their wheelbarrows and moved concrete to each pole location in that manner.
Ted Gillis the mason also dropped his staging off in preparation for a major rebuilding 2 of the 3 chimneys and a minor cleanup of the central chimney.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment